Excavation Support

Soil Nails create an insitu reinforcement system for the stabilization of excavations & slopes during top-down construction.

Dwyer's Soil Nail reinforcement system during top down construction

•  Oversized holes of 4” to 10” in diameter are drilled and the centralized soil nail is placed. The drill hole is then grouted.
•  After the drill hole grout is cured, the soil nails may be torque tensioned against the protective shotcrete face.

Dwyer's Rock Anchors in action!